[Bioperl-l] Proposed route to 1.2
Hilmar Lapp
hlapp@gnf.org
Mon, 14 Oct 2002 11:18:23 -0700
Hmm. I perfectly understand the need for a feature freeze, but
according to this plan it could be as long as 6-7 weeks. I may be in
the situation here to need implement a certain new feature during
that time, as may be Elia or others. If that happens, should we open
a branch then the additions on which are later re-merged into the
HEAD once 1.2 is branched off, or should 1.2 be branched off at the
time of feature freeze or shortly thereafter?
Both have their up- and downsides, so I don't have a strong
preference. Maybe there's a third option too that I'm not aware of.
You make the call what the rule is going to be ...
-h
On Monday, October 14, 2002, at 08:08 AM, Ewan Birney wrote:
>
> Mid Nov- feature freeze declared, check-ins should be
> elaborations and
> tweaks on feature set; API goes "semi slushy" so that Bioperl-db and
> Bioperl-pipeline can seriously test compatibility
>
>
--
-------------------------------------------------------------
Hilmar Lapp email: lapp at gnf.org
GNF, San Diego, Ca. 92121 phone: +1-858-812-1757
-------------------------------------------------------------